Excess Flow Valve (EFV) Durability

Abstract

This project will help to inform UK Gas Distribution Network Operators (GDNOs) and wider industry on the long-term suitability of existing Excess Flow Valve (EFV) designs in a future where hydrogen is being distributed in network pipelines. A risk to normal EFV functionality exists in the event that an ignition occurs within the downstream gas installation pipework and this project will help to understand the effectiveness of existing EFV designs to manage this risk, identifying any necessary modifications to existing EFV designs where appropriate.

The project will develop new learning in relation to the durability of existing EFV designs when subject to ignition overpressures of varying magnitude. The learning will inform the future design of EFVs to be installed on a 100% hydrogen network.

file format pdf download NIA_CAD0125_Project_Eligibility_Assessment_2025_06_04.pdf
Loading

Article metrics loading...

/content/projects/FI-0071
2025-05-01
2025-06-11
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error
Please enter a valid_number test