Flexible Gas Transition Plant – Phase 1 Feasibility Study

Abstract

Analysis of the distribution networks undertaken in the H2 Caledonia and H2 Connect projects has identified sectorisation isolation as the optimal approach for conversion. Sectorisation isolation allows for a sector-by-sector approach, ensuring the gradual conversion of existing Natural Gas connections over to hydrogen, or managing the disconnection process should customers opt for alternative heating solutions. This project will aim to develop an understanding of the technical and financial feasibility of a Flexible Gas Transition Plant (FGTP) through primary project outputs such as: outline of design options, development of a list of transition use cases, a cost benefit analysis (CBA) for each transition scenario, and a roadmap for future phases including prototype design and trials.

As this tool is not something in use across the GB gas networks, this work contributes to new learning via providing an innovative and novel solution. This will be achieved by developing an understanding of the technical and financial feasibility of a FGTP through primary project outputs such as: outline of design options, development of a list of transition use cases, a cost benefit analysis (CBA) for each transition scenario, and a roadmap for future phases including prototype design and trials.

file format pdf download FoE-0424_FGTP_Project_Document_Loader_Template_v4_(002).pdf
Loading

Article metrics loading...

/content/projects/NIA2_SGN0087
2025-06-01
2025-06-19
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error
Please enter a valid_number test