Skip to content
2009

Blending Management Approach – Phase 2

Abstract

The conversion of the National Transmission System into a hydrogen transmission network has been widely discussed, and it is recognised that blending of hydrogen and natural gas in the network is an important intermediary step towards that goal. It is therefore important to understand how the NTS will operate with a mix of natural gas and variable blends up to 20% hydrogen.

The Blending Management Approach (BMA) Phase 2 project will explore the operational, safety, and strategic implications of introducing low-level hydrogen blends into the National Transmission System (NTS), with a particular focus on storage interactions, emergency response scenarios, and long-term network management strategies. This phase aims to deepen understanding of how hydrogen blends interact with existing infrastructure and protocols.

The project presents significant opportunities for new learning in the transition to a hydrogen-blended energy system. By investigating the operational and safety implications of introducing hydrogen blends into the National Transmission System (NTS), the project will generate valuable insights into infrastructure compatibility, particularly with gas storage facilities. It will also enhance understanding of how low-level hydrogen blends interact with biomethane and oxygen content, informing future gas quality standards. The evaluation of emergency response tools will identify gaps and drive innovation in constraint mitigation strategies. Additionally, the project will explore strategic and operational levers for managing hydrogen blends, contributing to long-term network planning. Insights into optimal deployment of Gas Quality Monitoring and Telemetry (GQMT) equipment will support real-time blend tracking and operability. Overall, the project will deepen technical knowledge and inform policy, investment, and operational decisions critical to enabling a safe and efficient hydrogen transition.

file format pdf download NIA_NGT0282_Blending_Management_Approach_Phase_2.pdf
Loading

Article metrics loading...

/content/projects/NIA_NGT0282
2025-10-01
2025-10-22
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error
Please enter a valid_number test