Carbon Dioxide Repurposing procedure for the NTS
More LessThe project described covers the development of a new repurposing process for NTS assets to transport gaseous phase carbon dioxide. The approach for repurposing the National Gas Transmission System (NTS) to transport carbon dioxide will need an innovative approach to meet the timelines for the net zero transition. There have been several projects undertaken to date to determine the interactions of carbon dioxide with the network assets. We are looking to determine if these activities are providing all the relevant data and evidence required for our network to transition.
-
-
-
Carbon Networks
More LessAs the UK transitions to a low-carbon energy future, gas networks must consider how strategic utilisation of existing assets can be realised. GDNs must also consider adjacent markets such as CCUS and its role in the supply chain now and in the future. The project will take a pragmatic approach to provide SGN with an assessment of the role of the gas network in the growing UK CCUS market
-
-
-
Carbon Networks Phase 2
More LessThe UK Government has identified Carbon Capture, Utilisation and Storage (CCUS) as a critical enabler of industrial decarbonisation, committing £20 billion to early deployment and targeting 20-30 MtCO₂ stored annually by 2030. Much of the UK’s industrial emissions are geographically concentrated, opening the door to targeted CCUS clusters that can deliver outsized impact. GDNs are well positioned to play a meaningful role in this emerging ecosystem.
In Carbon Networks Phase 1, Blunomy assessed the strategic fit between CCUS and the GDN business model. The study identified a range of potential roles, including local CO₂ collection, participation in transport and storage networks, and support for blue hydrogen and CO₂ utilisation initiatives – and it highlighted the importance of early positioning to shape regulatory and commercial pathways.
Phase 2 aims to build on this foundation and move from conceptual framing to actionable insight. Blunomy in the next stage will explore specific industrial opportunities within SGN’s and WWU’s footprint, engage with project developers and clusters, and outline potential pilot activities. Alongside this, the work will assess how CCUS participation aligns with SGN’s broader priorities, and the implications for regulatory engagement and investment planning.
-
-
-
Clean Power Flexibility Investigation
More LessClean Power 2030 (CP2030) aims for a fully decarbonised electricity system, using unabated gas, only as backup. This introduces an important challenge: how can the gas transmission network remain viable and deliver flexibility during extreme demand events, despite not being utilised most of the time? This project aims to understand how to sustain the gas network technically and economically in a low average, high peak demand future, focusing on the interaction between gas and electricity systems.
-
-
-
Cominglo – Blended CV Measurement Point
More LessThis project seeks to improve the accuracy of CV measurement in gas networks which distribute blended gas streams. Element Digital Engineering will address this by first studying the physics of gas blending in the gas network using Computational Fluid Dynamics (CFD). A wide range of simulations will enable the effects of different designs and mixing technologies to be understood in relation to the various gases under consideration. The predictions of these CFD studies will be validated through the design and development of a rig to simulate blending in the network. The overall results of these studies will be used to develop a tool that can be deployed within the gas networks to facilitate the accurate prediction of co-mingling, and subsequent CV measurement points supporting the design of blending systems.
-
-
-
Commercial Vehicle Fleet – Development of Total Cost of Operation Model
More LessDecarbonisation of UK transport, and the related Zero Emission Vehicle (ZEV) mandate requires companies to transition their commercial vehicle fleets to Battery Electric Vehicles (BEV) or alternative new emerging technologies (e.g. FCEC). As an operational utility network with responsibility for public safety WWU’s fleet undergoes a more challenging and varied range of duty cycles than most commercial fleets, includes vehicles that are required to provide on-site power, and must be capable of meeting WWU’s statutory duty to respond quickly to Public Reported Escapes.
Within this challenging operational context, WWU must deliver a fleet transition at the lowest feasible cost to assure value for money for our customers. This is further complicated by the need to plan the fleet transition while the associated technological and policy landscape continues to evolve in parallel. Although the learnings generated from the project will be specific to WWU’s fleet as a case study, they will be applicable to any networks with an operational fleet.
To assure a cost-effective transition and derisk future operations, WWU require a Total Cost of Operation (TCO) model. This will be specifically targeted at our particular operational context, capable of assessing the costs and capabilities of a range of ZEV options, and crucially must be easy for staff to adopt for internal use and update in the future as new data and/or technologies become available.
The purpose of this project is to provide WWU with a TCO model that addresses our specific operational requirements, ensuring that plans and investment decisions will be grounded in real-world technology assessments and our operational fleet data.
-
-
-
Deblending Rollout Strategy Phase 2
More LessNational Gas Transmission (NGT) are committed to reducing emissions from the operation of the National Transmission System (NTS) and eliminating emissions by 2050. The transition to hydrogen provides an opportunity to reduce carbon and utilise the network for hydrogen refuelling for transport. The HyNTS Deblending for Hydrogen Transport project has involved the development of a UK-wide rollout strategy from ERM that lays out demand, clustering and potential locations for deblending supplied refuelling for transportation mapped against the NTS.
The project will aims to obtain further information on NRMM, maritime, cars, LGVs and mobile power to fully understand the hydrogen demand. It will also review the existing rollout strategy to ensure it is accurate and full captures the current hydrogen market given the changes in this landscape
-
-
-
Decentralised Alliance for South West Hydrogen (DASH)
More LessEarly cluster projects will not benefit I&C customers that are located away from industrial clusters and are traditionally more distributed in nature. These customers are unlikely to have access to hydrogen infrastructure developed through the primary industrial clusters. This presents the need for an alternative solution.
This project will explore the concept of how a larger number of low-volume hydrogen producers can support I&C customers in the absence of natural ‘clustering’ and high-volume production by using the South West region of WWU’s network as a case study. This will be done by exploring the whole systems concept of a gas network which is driven by distributed green hydrogen production at strategic locations where there is access to both gas and electricity grid infrastructure.
-
-
-
Decentralised System Resilience
More LessThis project constitutes a research study investigating the opportunities for gas network infrastructure to support storage and balancing in a decentralised UK energy system. The research will consider how a decentralised system might look in the UK from now until 2030, and onto 2050. An evaluation will be made of how other countries are approaching decentralisation, identifying examples the UK could draw on. Consideration will be given to how grid balancing will be achieved across various scenarios of peak demand and particular geographic locations in the UK and what challenges and opportunities this presents to gas networks.
-
-
-
Demonstrating Downstream Procedures For Hydrogen
More LessThis project involves a comprehensive set of tasks aimed at implementing and validating a domestic safety system for hydrogen use, including excess flow valves.
-
-
-
Determining Future Energy Demand of B&R Team Vans with Full On-Board Power
More LessWales & West Utilities is undertaking a major programme of change to support decarbonisation and deliver a Net Zero gas network. Decarbonisation of the vehicle fleet is an integral component of that programme.
WWU operates a fleet of nearly 1,400 commercial vehicles, the majority of these being vans up to 3.5 tonnes GVW. Our fleet – mostly diesel-fuelled - plays a crucial role in providing a safe and efficient service. In addition to our vehicle fleet, WWU operates ~ 900 items of mobile plant, including mini diggers and a wide range of trailers, many of which are specialised.
WWU vans carry a wide range of power-operated tools and equipment, some of this currently being powered by hydrocarbon fuels, some by electricity and some by compressed air. Approximately a third of our van fleet (~400 units) is equipped with ‘full on-board power’ – a compressor and generator, mounted under the van floor and mechanically driven by the diesel engine and operating as a source of on-site power.
This group of vehicles primarily supports below-ground network repair and replacement activity: it is a significant energy consumer, so to help us understand how we can make an operationally cost-effective transition to zero emissions, it is the on-site energy requirements of the tools and equipment powered by this group that Cenex will evaluate for this project. This evaluation will provide information which can take account of (and feed in to) a range of different scenarios for the fleet in the future, such as changes to the number and type of vans allocated to particular teams and projects.
-
-
-
Development of Technical Readiness for Bends and Tees
More LessHydrogen design codes require fracture mechanics based design and qualification for high stress service. Procurement of a number of Long Lead Items (LLI) is required to construct, commission and operate hydrogen networks. A number of these LLIs, including induction bends and barred tees, remain at a low technical readiness.
This project will carry out fracture toughness testing in a hydrogen environment to increase the technical readiness, support the supply chain and achieve operational schedules.
-
-
-
Development of Technical Readiness for Large Diameter Ball Valves
More LessIn order to construct, commission and operate new hydrogen pipelines and installations safely, and as part of modifications to existing assets for repurposing, ball valves are required to carry out isolations. Selected ball valves need to have been proven to be suitable for service in large diameter high pressure hydrogen networks.
This project will carry out performance validation testing on a 32″ ball valve to confirm suitability to operate in high pressure hydrogen networks.
-
-
-
Digital Decommissioning of Large-Scale Equipment
More LessAs the Gas Transmission network responds to a changing energy system, from drivers including the transition to net zero and to changes in supply and demand, we are required to decommission our large site based assets in certain locations. Decommissioning is a multifaceted endeavour that goes beyond the conclusion of an asset’s lifespan and encompasses a complex deconstruction process. This project will implement an innovative AI tool to help National Gas manage decommissioning to drive benefits such as increasing the accuracy of cost estimation, ways to reduce carbon emissions, identify re-use potential and lower the overall time taken to decommission.
-
-
-
Domestic Air Ingress Mitigations
More LessThis project will help to provide assurance to UK Gas Distribution Network Operators (GDNOs) and wider industry on the safe design of domestic gas appliances in a future where hydrogen is being distributed in network pipelines. A risk to the normal safe operation of appliances under 100% hydrogen operation exists where a flammable hydrogen/air mixture is supplied to the appliance, creating the potential for flashback to occur within the gas installation pipework. This work will provide assurance that domestic appliances designed to operate on 100% hydrogen are designed in a way which do not enable flashback to occur.
The project will also investigate the long-term feasibility of installing an auto-locking Emergency Control Valve (ECV) at the end of 100% hydrogen networks to ensure that any reinstatement of supply after a period of isolation can only be undertaken by a competent gas engineer.
-
-
-
East Midlands Hydrogen Storage (EMStor)
More LessUK’s Net Zero Emissions Target and the Role of Hydrogen: The UK has committed to a legally binding net zero emissions target by 2050. Achieving this target necessitates the integration of hydrogen, particularly in hard-to-decarbonize industrial applications and peaking power generation. The recent publication of the Climate Change Committee’s Seventh Carbon Budget highlights hydrogen’s significant role within the electricity supply sector. Hydrogen is identified as a crucial source of long-term storable energy that can be dispatched as needed and as a feedstock for synthetic fuels. For hydrogen to fully contribute to a future hydrogen system, its production, storage, and transportation must be considered collectively.
East Coast Hydrogen (ECH) Project: In recent years, Cadent, in partnership with National Gas and Northern Gas Networks (NGN), has developed the East Coast Hydrogen (ECH) Project. The ECH project aims to decarbonize primarily industry and power sectors. As part of this initiative, Cadent has developed the East Midlands Hydrogen Pipeline (EMHP), which aims to connect hydrogen production at Uniper’s Ratcliffe on Soar site to major industrial and power off-takers in the East Midlands. The project seeks to transport hydrogen to major population centres, including Nottingham, Leicester, Melton Mowbray, Derby, and Burton upon Trent. During the development of the EMHP, it became evident that hydrogen storage plays a critical role in establishing a resilient and efficient hydrogen system. Consequently, a consortium was formed to explore the feasibility of storage, leading to the East Midlands Storage Project (EMSTOR).
Discovery Phase of EMSTOR: During the Discovery Phase, EMSTOR evaluated various technologies for large-scale hydrogen storage in the East Midlands. The technologies considered included lined rock caverns, lined rock shafts, silos, and geological storage options such as aquifers and disused hydrocarbon fields. After comparing these technologies against several technical parameters, including Technology Readiness Level (TRL), cost, size, and location relative to pipelines, it was determined that hydrogen storage in geological fields, particularly disused hydrocarbon fields, is the most viable option. Therefore, disused hydrocarbon fields in geological formations were selected for further consideration in the Alpha Phase.
Alpha Phase Consortium: To execute the Alpha Phase, a consortium led by Cadent and including Star Energy Ltd, Centrica Energy Storage, National Grid, British Geological Society, University of Edinburgh, and Uniper was established. This consortium will focus on advancing the feasibility and implementation of hydrogen storage in disused hydrocarbon fields.
-
-
-
Economics of Biomethane
More LessThe consultant will deliver a report with supporting data to demonstrate that the economics stack up for biomethane, while also supporting the UK’s net zero ambitions and contributing to our energy security.
-
-
-
Effects of Water Ingress in a Hydrogen Network
More LessWales & West Utilities is undertaking a major programme of change to support decarbonisation and deliver a Net Zero gas network. The primary objective of this project is to investigate the effects of water ingress within a 100% hydrogen network and a blended hydrogen/natural gas network. The goal is to determine whether the introduction of hydrogen into the gas network could cause any additional impacts when water ingress occurs, and to compare these effects to those observed in the current natural gas network.
-
-
-
Energy Plan Translator
More LessDevelop a flexible and adaptable toolset for the rapid analysis of Local Area Energy Plans (LAEPs). This will convert qualitative statements to quantified metrics and identify key network specific planning parameters.
-
-
-
Enhancement of the anaerobic digestion process for biomethane production
More LessThe UK Government recognised that domestic biomethane production can play a significant role in decarbonising energy supplies. However, biomethane production plants face technical and operational challenges. Currently the content of biomethane within biogas produced from the anaerobic digestion (AD) process is often only around 50%. This partial conversion results in lower yields for AD operators and an increase in costly gas scrubbing requirements. The increased presence of impurity gases also increases requirement for propanation to increase the calorific value, high in both cost and carbon footprint.
This project seeks to address these challenges through the injection of green hydrogen into the AD process in specific quantities and at specific times to achieve greater conversion of carbon dioxide to biomethane within the acetogenesis stage of the AD process, thereby increasing the yield whilst reducing the need for gas scrubbing and propanation.
-