Projects
Demonstrating Downstream Procedures For Hydrogen
This project involves a comprehensive set of tasks aimed at implementing and validating a domestic safety system for hydrogen use including excess flow valves.
Maximising Capacity at Biomethane Sites
This project will develop network and/or entry site solutions that will enable biomethane supply to meet the swings in demand through the year.
Hydrogen Rollout Assessment
This project will help WWU to understand considerations for 100% Hydrogen Rollout at a town scale to inform future activity on preparation for repurposing. Areas will be chosen which are representative of different networks housing stock and demographics which will require different approaches and engagement.
Air Ingress in a Live Environment
Using Cartrefi Hydrogen Home as a test case this project will enable remote monitoring of air ingress phenomena within the home. The system will be used to characterise the current behaviour of the house and to investigate generic air ingress dynamics in a representative domestic hydrogen installation.
Control Room Automation
NGN use various systems with each one requiring different levels of human interaction. The drive towards net zero will involve the introduction of a multi-gas network increasing the network’s complexity. It’s envisaged there’ll be an additional amount of human interaction required to support the systems resulting in staff having to spend less time on strategic initiatives and operational challenges. The control room needs to be future ready to improve productivity and operational efficiency hence the necessity for additional interactions to support the various systems mentioned below.
- SCADA
- Business applications
- Electronic logging system
Alongside the EIC we have completed the ‘Call for Innovation’ process and identified a supplier to deliver a feasibility study to identify vendors offering platform technology for: Automation Enhancement of situational awareness.
Probabilistic Fitness-for-Service Assessment of Hydrogen Pipeline Girth Welds
Repurposing of natural gas pipelines made of carbon steel for use with hydrogen blends requires a fitness-for-service analysis as part of the hydrogen use safety case. Girth welds of an unknown quality exist in the Local Transmission System (LTS). In hydrogen service these welds would have a greater susceptibility to fracture failure due to material embrittlement caused by interaction of steel material with hydrogen.
Current inspection methods do not routinely inspect girth welds for defects. Deterministic defect assessment models require the use of conservative assumptions for defect sizes material properties and loading. This can lead to overly pessimistic conclusions about the suitability of pipelines with girth welds for use with hydrogen.
More detailed probability-based assessments are required to reduce the inherent pessimism in deterministic calculation methods. This would provide confidence of the safety and allow for greater use of the LTS with hydrogen and contribute to a quicker and cheaper energy transition for the UK gas network.
The Warmth of Community
This project will conduct market research on available or soon to be available hybrid products for discussion and presentation back to WWU and WW Housing to choose a preferred solution for the properties identified that are suitable to trial the equipment in. The project will provide networks with demand data and look to aggregate this over WW Housing stock to understand wider impact on gas networks if this was considered a viable option to decarbonise housing stock.
The Impact of District Heating on Our Network
This project will investigate the potential impacts of district heating on the gas network whether its viable for the network to support district heating and what repurposing would be required.
Cominglo – Blended CV Measurement Point
This project seeks to improve the accuracy of CV measurement in gas networks which distribute blended gas streams. Element Digital Engineering will address this by first studying the physics of gas blending in the gas network using Computational Fluid Dynamics (CFD). A wide range of simulations will enable the effects of different designs and mixing technologies to be understood in relation to the various gases under consideration. The predictions of these CFD studies will be validated through the design and development of a rig to simulate blending in the network. The overall results of these studies will be used to develop a tool that can be deployed within the gas networks to facilitate the accurate prediction of co-mingling and subsequent CV measurement points supporting the design of blending systems.
Future Hydrogen Safe Control of Operations (SCO) Procedures
Following the work completed on the policies and procedures project by QEMS WWU have identified the requirement to update and re-vamp the existing Safe control of operations (SCO) procedures used by the network to support delivery of upcoming projects.
Hydrogen Permeation through the Oxide Layer Phase 1
This project is looking to address uncertainties surrounding LTS pipeline materials by investigating the effect of the oxide layer on hydrogen permeation rate for steel pipelines. This project will also investigate the formation of an oxide layer inside the pipe at different temperatures as well as how the microstructure of the pipeline steel and condition of the oxide layer affect permeation for different grades of steel. It is critical this relation is better understood as these uncertainties are currently hindering our ability to fully and accurately assess the repurposing of the LTS. The outcomes of this project have the potential to increase cost-savings and improve confidence in the existing network to carry hydrogen including blends.
Decentralised Alliance for South West Hydrogen (DASH)
Early cluster projects will not benefit I&C customers that are located away from industrial clusters and are traditionally more distributed in nature. These customers are unlikely to have access to hydrogen infrastructure developed through the primary industrial clusters. This presents the need for an alternative solution.
This project will explore the concept of how a larger number of low-volume hydrogen producers can support I&C customers in the absence of natural ‘clustering’ and high-volume production by using the South West region of WWU’s network as a case study. This will be done by exploring the whole systems concept of a gas network which is driven by distributed green hydrogen production at strategic locations where there is access to both gas and electricity grid infrastructure.
Achieving Future Hydrogen Demand
This project constitutes a research study assessing the future demand for hydrogen across SGN regions and the role SGN infrastructure could play in facilitating access to hydrogen.
As the UK transitions to a low-carbon energy future gas networks must consider how strategic utilisation of existing assets can be realised. Using SGN’s extensive gas network to carry hydrogen instead of natural gas would be a major step towards decarbonisation. This repurposing necessitates an understanding of both the technical feasibility of repurposing pipelines to carry hydrogen and future hydrogen demand requirements.
Decentralised System Resilience
This project constitutes a research study investigating the opportunities for gas network infrastructure to support storage and balancing in a decentralised UK energy system. The research will consider how a decentralised system might look in the UK from now until 2030 and onto 2050. An evaluation will be made of how other countries are approaching decentralisation identifying examples the UK could draw on. Consideration will be given to how grid balancing will be achieved across various scenarios of peak demand and particular geographic locations in the UK and what challenges and opportunities this presents to gas networks.
Finding the Hidden Vulnerable
This innovation project proposal is centred on trialling the development of a predictive model to identify customers in vulnerable situations whose heat comes from Cadent delivered gas that are missing out on the protections that the Priority Service Register (PSR) brings because they are “hidden” behind a non-domestic supply contract. The aim of the predictive model would be to aid Cadent to find these customers so that it can be ensured that they receive the support that they need in the event of an interruption to supply.
Pathfinder Enhancements
This project will update the Pathfinder tool to improve functionality and reflect more current underlying data. Use of the tool developed in this project should result in better choices regarding investment in energy saving measures
Reducing Gas Emissions During Pipeline Commissioning
Based on previous work ROSEN Engineers believe the quantity of natural gas vented during commissioning operations can safely be reduced by up to 80% through targeted changes to direct purging procedures.
For Gas Distribution Networks’ (GDNs) gas venting remains a necessary part of normal operations for maintenance or safety purposes. Previous research work undertaken by ROSEN(UK) Limited for the EIC with project partners Northern Gas Networks (NGN) and Wales and West Utilities (WWU) identified activities where venting of natural gas to atmosphere occurs (Gas Venting Research Project NIA reference number NIA_NGN_282)
Assessing Energy Impacts via Thermal Analysis
The project aims to use a vehicle-mounted thermal camera and Artificial Intelligence (AI) to detect heat loss from homes on a city-wide scale. The data will be used to assess the condition of a property regarding its ability to retain heat and provide tailored recommendations addressing insulation problems. This critical first step allows for better targeting of necessary retrofits and offers a scientifically measured alternative or complementary approach to traditional EPC.
Digital Decommissioning of Large-Scale Equipment
As the Gas Transmission network responds to a changing energy system from drivers including the transition to net zero and to changes in supply and demand we are required to decommission our large site based assets in certain locations. Decommissioning is a multifaceted endeavour that goes beyond the conclusion of an asset’s lifespan and encompasses a complex deconstruction process. This project will implement an innovative AI tool to help National Gas manage decommissioning to drive benefits such as increasing the accuracy of cost estimation ways to reduce carbon emissions identify re-use potential and lower the overall time taken to decommission.
FutureGrid CO2
FutureGrid CO2 is the final phase of a suite of Carbon Dioxide projects looking at how National Gas can repurpose parts of its network to transport gaseous-phase Carbon Dioxide safely. What started out as literature reviews and feasibility studies will turn into physical testing and demonstration. National Gas will be using its world-leading FutureGrid facility to demonstrate how Carbon Dioxide will flow through its pipes delivering on its promise to further use this facility after our successful FutureGrid SIF Beta projects. We will also be completing carbon dioxide venting ruptures and real-time impurity corrosion tests- all of which are underexplored.