Net zero and the energy system transition
Project GRID (Green Renewable Infrastructure Demand)
Project GRID (Green Renewable Infrastructure Demand) will investigate how biomethane can support the decarbonisation of two strategically important sectors: heavy goods vehicle (HGV) transport and data centres. The project will assess the technical commercial and operational feasibility of using biomethane as a low-carbon fuel for freight transport and as a primary or backup energy source for data centres.
The project will undertake a detailed review of previous work stakeholder engagement programme and spatial analysis to understand future demand available biomethane supply and opportunities for deployment. Detailed assessments will then be completed for Somerset Council’s fleet and for current and future data centre developments within the Wales & West Utilities (WWU) network area.
The outputs will provide evidence on how biomethane can support economic growth facilitate decarbonisation make greater use of indigenous renewable gas resources and potentially unlock additional biomethane injection opportunities across gas distribution networks.
Co2 Capture and Methanation Feasibility Study
The project focuses on exploring practical and innovative pathways for CO₂ utilisation with the goal of supporting scalable and cost-effective carbon management solutions. It examines a range of technologies market mechanisms and regional integration opportunities to better understand how captured CO₂ can be effectively reused. A key emphasis is placed on evaluating the economic feasibility of utilisation particularly through methanation including the potential commercial value of CO₂ and e-methane. The study combines technical and economic analysis with a case study of a methanation plant while also assessing local CO₂ markets and potential sales opportunities. The project also addresses key risks such as technology uncertainty hydrogen pricing and market volatility. Overall it aims to de-risk investment and stimulate the development of the CO₂ utilisation market from the AD sector.
This study assesses the available pathways to recover and monetise the biogenic CO₂ stream produced during biogas upgrading at UK anaerobic digestion (AD) plants with a particular focus on using it to produce synthetic natural gas (SNG). The study begins with extensive stakeholder and technology vendor engagement to identify suitable CO₂ sources potential utilisation pathways market opportunities and technology options.
A central element of the study is the development of a detailed methanation case study based on the capture of approximately 500 Nm³/h of biogenic CO₂ and the conversion of this CO₂ into e-methane using low-carbon hydrogen. Feasibility-level engineering will be completed for both the carbon capture and methanation facilities including process modelling mass and energy balances block flow diagrams preliminary process flow diagrams equipment sizing site layouts and Class 5 capital cost estimates supported by vendor data. These engineering outputs will underpin a detailed economic assessment examining the impact of key variables such as hydrogen cost electricity prices CO₂ value carbon credits and certificate revenues on the levelized cost of e-methane production. The study also includes a local CO₂ market assessment a review of by-product utilisation opportunities such as reaction water and waste heat recovery and the development of a roadmap outlining the steps.
Hydrogen Permeation through the Oxide Layer Phase 1
This project is looking to address uncertainties surrounding LTS pipeline materials by investigating the effect of the oxide layer on hydrogen permeation rate for steel pipelines. This project will also investigate the formation of an oxide layer inside the pipe at different temperatures as well as how the microstructure of the pipeline steel and condition of the oxide layer affect permeation for different grades of steel. It is critical this relation is better understood as these uncertainties are currently hindering our ability to fully and accurately assess the repurposing of the LTS. The outcomes of this project have the potential to increase cost-savings and improve confidence in the existing network to carry hydrogen including blends.
Decentralised Alliance for South West Hydrogen (DASH)
Early cluster projects will not benefit I&C customers that are located away from industrial clusters and are traditionally more distributed in nature. These customers are unlikely to have access to hydrogen infrastructure developed through the primary industrial clusters. This presents the need for an alternative solution.
This project will explore the concept of how a larger number of low-volume hydrogen producers can support I&C customers in the absence of natural ‘clustering’ and high-volume production by using the South West region of WWU’s network as a case study. This will be done by exploring the whole systems concept of a gas network which is driven by distributed green hydrogen production at strategic locations where there is access to both gas and electricity grid infrastructure.
Reducing Gas Emissions During Pipeline Commissioning
Based on previous work ROSEN Engineers believe the quantity of natural gas vented during commissioning operations can safely be reduced by up to 80% through targeted changes to direct purging procedures.
For Gas Distribution Networks’ (GDNs) gas venting remains a necessary part of normal operations for maintenance or safety purposes. Previous research work undertaken by ROSEN(UK) Limited for the EIC with project partners Northern Gas Networks (NGN) and Wales and West Utilities (WWU) identified activities where venting of natural gas to atmosphere occurs (Gas Venting Research Project NIA reference number NIA_NGN_282)
FutureGrid CO2
FutureGrid CO2 is the final phase of a suite of Carbon Dioxide projects looking at how National Gas can repurpose parts of its network to transport gaseous-phase Carbon Dioxide safely. What started out as literature reviews and feasibility studies will turn into physical testing and demonstration. National Gas will be using its world-leading FutureGrid facility to demonstrate how Carbon Dioxide will flow through its pipes delivering on its promise to further use this facility after our successful FutureGrid SIF Beta projects. We will also be completing carbon dioxide venting ruptures and real-time impurity corrosion tests- all of which are underexplored.
HyBlend II
This project assembles a multi-laboratory team to address high-priority research topics identified by industry related to the blending of hydrogen into the U.S. natural gas pipeline network. PRCI has been contracted by DOE to provide contract and invoicing support which allows additional members to join after project start.
There were four main activities being performed in Phase 1 of the CRADA project that fell under two categories: materials research and analysis. Sandia National Laboratories (SNL) led the materials research on metals which is primarily used for natural gas transmission while Pacific Northwest National Laboratory (PNNL) headed the research on polymeric materials which comprise the natural gas distribution network. Argonne National Laboratory (ANL) was responsible for life-cycle analysis while the National Renewable Energy Laboratory (NREL) performed techno-economic analysis on hydrogen blending scenarios the work on these subjects will be extended in Phase 2.
Project GaIN
As the UK attempts to decarbonise residential heat to meet net zero by 2050 electric heat pumps along with heat networks are expected to play a key role. However it is generally accepted that no one technology will be able to meet the needs of all households. If we are to deliver affordable low- carbon heating in the residential sector we shall need as wide a range of technology options as possible to overcome the economic and technical challenges facing every customer.
Project GaIN (Gathering Insights) will explore alternatives to heat pumps and heat networks which can utilise the robust gas network and benefit from its current upgrade programme supporting the aims of DESNZ’s decarbonisation of heat roadmap. The project will discover and assess additional technology options where alternative solutions might be more costly or difficult to deliver; this will include LAEP system benefits as well as localised CAPEX and OPEX costs.
Gas Networks Evolution Simulator
The Gas Network Evolution Simulator (GNES) is an innovative project aimed at optimising the transition away from natural gas by using advanced Agent Based Modelling (ABM). GNES simulates the complex interactions between stakeholders such as Gas Distribution Networks (GDNs) Electricity Networks consumers and policymakers. It analyses economic social and environmental impacts of gas network decommissioning and explores new infrastructure opportunities. By identifying challenges and benefits GNES supports the development of cost-effective equitable solutions that support vulnerable populations ensuring a smooth transition to low-carbon energy sources while minimising consumer disruption and maximising network efficiency.
East Midlands Hydrogen Storage (EMStor)
UK’s Net Zero Emissions Target and the Role of Hydrogen: The UK has committed to a legally binding net zero emissions target by 2050. Achieving this target necessitates the integration of hydrogen particularly in hard-to-decarbonize industrial applications and peaking power generation. The recent publication of the Climate Change Committee’s Seventh Carbon Budget highlights hydrogen’s significant role within the electricity supply sector. Hydrogen is identified as a crucial source of long-term storable energy that can be dispatched as needed and as a feedstock for synthetic fuels. For hydrogen to fully contribute to a future hydrogen system its production storage and transportation must be considered collectively.
East Coast Hydrogen (ECH) Project: In recent years Cadent in partnership with National Gas and Northern Gas Networks (NGN) has developed the East Coast Hydrogen (ECH) Project. The ECH project aims to decarbonize primarily industry and power sectors. As part of this initiative Cadent has developed the East Midlands Hydrogen Pipeline (EMHP) which aims to connect hydrogen production at Uniper’s Ratcliffe on Soar site to major industrial and power off-takers in the East Midlands. The project seeks to transport hydrogen to major population centres including Nottingham Leicester Melton Mowbray Derby and Burton upon Trent. During the development of the EMHP it became evident that hydrogen storage plays a critical role in establishing a resilient and efficient hydrogen system. Consequently a consortium was formed to explore the feasibility of storage leading to the East Midlands Storage Project (EMSTOR).
Discovery Phase of EMSTOR: During the Discovery Phase EMSTOR evaluated various technologies for large-scale hydrogen storage in the East Midlands. The technologies considered included lined rock caverns lined rock shafts silos and geological storage options such as aquifers and disused hydrocarbon fields. After comparing these technologies against several technical parameters including Technology Readiness Level (TRL) cost size and location relative to pipelines it was determined that hydrogen storage in geological fields particularly disused hydrocarbon fields is the most viable option. Therefore disused hydrocarbon fields in geological formations were selected for further consideration in the Alpha Phase.
Alpha Phase Consortium: To execute the Alpha Phase a consortium led by Cadent and including Star Energy Ltd Centrica Energy Storage National Grid British Geological Society University of Edinburgh and Uniper was established. This consortium will focus on advancing the feasibility and implementation of hydrogen storage in disused hydrocarbon fields.
Understanding the value of remote detectors
The statistical ‘value’ (i.e. risk reduction and cost) of remote hydrogen detectors has been determined through statistical based projects as part of the hydrogen heating programme (HHP). The cost has been shown to outweigh the risk however given hydrogen is not a mature heating solution the cost can be justified in response to risk appetite from key stakeholders such as consumers. This risk appetite is assumed. There is currently no analysis (qualitative or quantitative) into consumers attitudes towards the ‘value’ of remote detectors. This project will begin to explore the perception of risk reduction from remote detectors to be used to compliment the statistical based analysis to paint a fuller picture towards the utilisation and crucially the value of remote detectors.
Welding Residual Stress Measurements and Analysis for Gas Pipelines
This project concerns the research into welding residual stress values and the effect that they have on the overall pipework repurposing assessment route described in relevant hydrogen standards. Currently overly conservative values need to be applied for welding residual stresses in any repurposing assessment. This project aims to build evidence on actual and modelled residual stresses seen within the pipelines industries with a focus on natural gas pipelines. As the welding residual stress is a critical aspect of the fracture mechanics assessment any improvements which can be gained would have an overall positive impact on the assessment results.
Hybrid Heat Systems (HHS) Acceleration Route
Project will deliver strategic analysis and recommendations to support the accelerated adoption of Hybrid Heat Systems (HHS) in GB. This includes assessing technology options commercial models stakeholder perspectives and system integration pathways. The work will result in actionable insights clear positioning of HHS within the wider decarbonisation strategy.
Hydrogen-Enhanced Biomethane for Energy System Resilience
Biomethane from Anaerobic Digestion is currently injected into Gas Distribution Networks as a renewable alternative to fossil-fuel based natural gas.
AD plants currently supply largely constant flows whilst gas demand fluctuates daily and seasonally creating supply-demand imbalances which increase system balancing requirements.
Flexible locally produced biomethane could help GDNs manage system balance by increasing injection during demand peaks or cold spells.
This project will use biomethanisation injecting hydrogen to convert additional CO₂ within digesters to boost biomethane output dynamically supporting network balancing and Net-Zero ambitions.
Operational and regulatory frameworks will also be assessed to enable wider adoption of dynamic injection.
LISTEN – Local Insights Supporting Transparent Energy Networks
The LISTEN (Local Insights Supporting Transparent Energy Networks) project aims to create a scalable data-led approach to understanding and building social consent for the energy transition. LISTEN integrates AI-driven tools place-based engagement and co-designed dashboards to help energy networks plan with communities not just for them.
The platform brings together four core elements:
- Regional Dashboards: Visualising insights by geography topic and demographics to inform planning and engagement strategies.
- Multi-Source Data Capture: Synthesising local news social media planning documents and community events for a holistic view of local feeling.
- Voice-Enabled Surveys: Capturing authentic community sentiment in people’s own words with AI sentiment analysis assessing tone confidence and emotion.
- Tailored Recommendations: Providing SGN and partners with actionable insights and engagement strategies aligned with Ofgem’s fairness and consumer-centric priorities.
RTN modelling- Bio Methane
The UK gas networks are undergoing a major transition to support the integration of green gases including biomethane and hydrogen. A significant challenge is the inability of the current design modelling. Cadent’s current modelling relies on outdated assumptions and lacks the granular real-time demand insight needed for modern decarbonising gas networks. Existing tools cannot capture intra-day demand variability below-7-bar network complexity or the growing impact of biomethane injections—creating risks in planning operational decisions and reinforcement strategy.
RTN addresses these challenges by delivering accurate weather-adjusted consumer-level demand modelling and integrated analysis across pressure tiers. This enhances forecasting improves biomethane integration and strengthens model validation and operational control. In the future state RTN provides Cadent with a modern data-rich and automated modelling capability that reduces unnecessary reinforcement improves customer outcomes supports the energy transition and lays the foundation for potential future use in peak-demand modelling and regulatory engagement.
This programme is leveraging the data and learning from historic projects to develop a range of novel network modelling tools that will enable bio gas designs to be informed consumer focused and optimised for localised conditions and demands.
H2 Housing Design
This project will explore ventilation and explosion relief requirements for housing currently used on the gas network for pressure regulating installations (PRIs). Housings currently provide security from a range of factors from weather to vandalism while also providing the necessary relief requirements in the event of an emergency. The understanding of these requirements for Natural Gas has been developed however work conducted in the IGEM TD/13 hydrogen supplement did not fully address whether these design specifications are suitable for use with Hydrogen. This multi-stage project will first explore the design specifications listed in industry standards (IGEM/TD/13 GIS/PRS/35 SGN/SP/CE/10 etc) and understand which of these may be appropriate and which may require redesign. The latter stage of this project will take the design specifications deemed to be unsuitable for use with hydrogen and conduct testing to develop revised design specifications which would provide the necessary relief requirements.
IGEM TD1 / TD13 Hydrogen Supplements Review
IGEM have received requests from operators to update the hydrogen TD1 / TD13 supplements to take account of outputs from research projects. The project will review and assess the updates required based on findings from completed hydrogen research projects. This will support the repurposing of existing pipelines and installations from Natural Gas to hydrogen and Natural Gas/hydrogen blends with input and support from users/stakeholders and formal approval by IGEM.
The project will also develop a methodology for fracture and fatigue assessments for existing Natural Gas pipelines to be repurposed to hydrogen service. This methodology will assess the impact of blends of hydrogen up to and including 100% hydrogen to determine whether pipeline derating and/or deblending is required. The requirements for the application of this specification should be included in the updates to the IGEM/TD/1 and IGEM/TD/13 hydrogen supplements.
Hazardous Areas Impact Mitigation (HAIM) Phase 3
NIA_NGN_346 demonstrated that in a 100% hydrogen conversion scenario hazardous areas of some above ground installations (AGIs) on the network would extend far beyond their current site boundaries. The Hazardous Area Impact Mitigation (HAIM) work programme was set up to investigate these findings and develop potential mitigations. Results highlighted discrepancies between the calculated values from the IGEM/SR/25 hydrogen supplement and empirical test measurements as well as revealed the compound impact of rounding on calculated hazardous zones.
HAIM 3 will propose two methods to reduce the specified zones from AGIs based on the evidence to date:
- Refine the IGEM/SR/25 supplement based on evidence from the HAIM results.
- Use the knowledge gained during the HAIM works to adapt AGI vents and sites to reduce plume sizes and hence exclusion zones. This is independent of any changes to IGEM/SR/25 and can be applied in parallel.
Both methods independently act to reduce the specified zones surrounding vent pipes in AGIs.
Additional evidence gaps around hydrogen/Natural Gas blends up to 20% will be examined by replicating the phase 2 workshop tests for blends. During the project additional opportunities will be sought to collaborate and share knowledge with any third-party studies of large-scale gas releases.
Fairer Warmth Hub
The Fairer Warmth Hub (FWH) connects stakeholders of the Net Zero Transition through place-based strategies providing tools and guidance to facilitate local energy plans and enhance collaboration. The FWH integrates digital tools and community engagement to facilitate effective communication and planning among diverse stakeholders including households small businesses schools social healthcare and local authorities. FWH is designed to bridge the gap in the energy transition by providing tailored support to these stakeholders ensuring that the transition is inclusive and just. The FWH integrates three core elements:
- Trained ‘Champions’ – Volunteers or staff known as Champions are recruited and trained to support community engagement helping to build trust and reduce miscommunication in local energy initiatives.
- Digital Tools (Virtual Assets) – Innovative digital tools (App + Website) and resources are used to facilitate energy transition planning and community engagement particularly assisting Customer In Vulnerable Situation (CIVS) and those who are digitally excluded.
- Community Centres (Non-Virtual Assets) – Physical community hubs serve as accessible locations for hands-on support providing a space for CIVS and other stakeholders to engage directly in the energy transition.