Projects
Understanding Consumer Behaviours for a Just Energy Transition
This project will deliver independent evidence‑based research on consumer behavioural insights relating to domestic heat sources during the energy system transition. It comprises four work packages (WP0–WP4) that build on one another to create tangible outputs for WWU and other Network Licensees: desk research and gap analysis (WP1) SME engagement and sentiment analysis (WP2) consumer research including a 4000‑respondent survey user‑journey mapping and CIVS insights (WP3) and integration of insights through decision trees synthetic population modelling and cost‑benefit analysis (WP4).
Hydrogen Environment Testing of Girth Welds Phase 2 - Constant Load Testing
Previous testing carried out under NIA has outstanding gaps that require further testing to close. Completing the additional testing will confirm actual fracture toughness values to be used and the corresponding J value from the crack growth resistance curve. The project outputs are required and will be used to progress design specification and procurement processes for hydrogen major projects. The results can also be applied for repurposing assessments.
Biomethane feedstock deliverability
Cadent have been working with The Green Gas Taskforce to commission a series of reports that examine the benefits of greater biomethane generation to Great Britain’s energy system as well as the economic benefits that such volumes of green gas could provide. Work conducted by Alder BioInsights in their “Green Gas Future” report concluded that biomethane volumes of 120 TWh are possible in the UK by 2050 based on technical potential of UK feedstocks.
This project seeks to explore the operational emissions market and developmental implications of meeting the potential volumes published by Alder BioInsights (120 TWh pa by 2050) as well as the implications of meeting the NESO FES 25 Holistic Transition scenario relating to the production of biomethane in the UK (36 TWh per annum by 2035 and 64 TWh per annum by 2050).
The conclusions of this project will be published in a public report entitled “Delivering Green Gas” that:
- Outlines the viability benefits and key questions behind the integration of the UK’s agricultural supply chain AD industry and gas distribution networks.
- Highlights where they may be trade-offs or unintended consequences introduced by scaling feedstock production for biomethane and if there are ways that these can be addressed to mitigate the impact.
- Defines concrete actions that need to be taken in the agricultural sector by agricultural policy makers and others to unlock the feedstock volumes set out in the Alder BioInsights work and the NESO scenarios where this is appropriate and doesn’t introduce undesirable consequences.
- Sets out the broader economic and environmental benefits that could be provided in delivering these volumes of biomethane beyond the energy sector and particularly to the UK’s agricultural sector.
Air Ingress in Multi Occupancy Buildings (MOBs)
This project will help to inform UK Gas Distribution Network Operators (GDNOs) and wider industry on the impact of the potential for air ingress into gas-conveying pipework in MOBs. The mechanisms for air ingress into gas-conveying pipework have been shown to be gas agnostic though this project will focus on impacts specific to future hydrogen distribution to MOBs.
Energy Plan Translator
Develop a flexible and adaptable toolset for the rapid analysis of Local Area Energy Plans (LAEPs). This will convert qualitative statements to quantified metrics and identify key network specific planning parameters.
Future Hydrogen Safe Control of Operations (SCO) Procedures
Following the work completed on the policies and procedures project by QEMS WWU have identified the requirement to update and re-vamp the existing Safe control of operations (SCO) procedures used by the network to support delivery of upcoming projects.
Application of Functional Blending - Testing a Market-led Approach
Wales & West Utilities has developed a Regional Decarbonisation Pathway to provide an overarching strategic plan for the network in Wales and the South West of England. To deliver that pathway more detailed assessment and planning is required to facilitate the progression of opportunities in particular areas.
In 2023 WWU supported Cadent as the lead partner in the development and delivery of a Functional Blending Specification (FBS) which has progressed the technical understanding of how blending equipment can be practically applied within the context of existing gas network assets (
PE Service Pipe Disconnection Phase 2
The PE Service Pipe disconnection project is an evolution from the development project in phase 1 this project is a monitored field trial evaluating a new non-excavation method for permanently disconnecting polyethylene (PE) gas service pipes that terminate in external meter boxes. Developed in collaboration with Steve Vick International and UK Gas Transporters the technique uses a foam plug and sealant system deployed through the external emergency control valve to safely isolate and abandon the service pipe as near as reasonably practicable to the main. The aim is to demonstrate compliance with gas safety legislation while reducing the need for highway excavation lowering costs improving safety and minimising disruption. The trial will gather operational safety and performance evidence to support potential wider adoption and HSE acceptance.
Finding the Hidden Vulnerable Stage 2
Following on from Stage 1 of the project which assessed if a predictive model could be used to find hidden vulnerability the next stage of the project is focused on identifying customers in vulnerable situations whose heat comes from Cadent delivered gas that are missing out on the protections that the Priority Service Register (PSR) brings because they are “hidden” behind a non-domestic supply contract and may not be immediately visible through existing data sets and ways of working. The project aims to proactively identify and support hidden customers in vulnerable situations within Cadent’s network by developing a data-driven model that integrates existing datasets from different sources ensuring that they receive the support that they need in the event of an interruption to supply.
MASiP Phase 3 (Qualification Testing & Integrated System Development)
The MASiP Phase 3 is developing a new pipeline system to serve as an alternative to conventional steel pipelines in the transmission network. The material used in this pipeline will render it capable of transporting natural gas biogas and up to 100% hydrogen. Building on Phases 1 and 2 this phase focuses on the technical assessment of tight radius bends tees and damage repair as well as the integration of live monitoring systems in a prototype operational environment.
Comprehensive validation will include connectors coatings repair systems hot-tapping solutions ground movement tolerance durability and design life testing. All testing will be carried out in accordance with IGEM API and ASME standards.
The key deliverable is a validated deployable hydrogen-ready pipeline system that is safe compliant and cost-effective offering potential cost savings of up to 50% compared with steel. The project outcomes will support the UK’s RIIO-GD2 strategy and 2050 net-zero targets by enabling hydrogen-ready infrastructure improving monitoring installation efficiency and long-term reliability while also providing the evidence base required for regulatory policy and industry acceptance of alternative pipeline materials.
Low Carbon Conversion of Non Domestic Properties Utilising Distributed Natural Gas
This project investigates the technical and economic feasibility of converting non-domestic buildings from natural gas to low carbon energy sources specifically hydrogen and electricity. It aims to address the significant evidence gap around the conversion of commercial and institutional buildings that are currently supplied by the GB gas distribution networks. The study will assess a wide range of building archetypes including care homes schools hospitality venues and light industrial sites using a combination of literature review site surveys detailed system designs and technoeconomic modelling. The outputs will inform future energy policy support infrastructure planning and help ensure safe and cost-effective deployment of low carbon technologies in non-domestic settings.
Validation of Olfactory Assessment Methodology for 100% Hydrogen Network
To ensure that the users and general public recognise and report hydrogen leaks without further education current guidance states that the smell of hydrogen should be indistinguishable from that of natural gas. It is also expected that the same odourant will be used in hydrogen networks as is currently injected to natural gas and so it is essential to ensure that existing methodologies for olfactory assessment (Rhinology) originally developed for natural gas are safe effective and applicable to 100% hydrogen environments.
Biomethane Certificate Trading Platform
This project will deliver an initial assessment of the feasibility value and delivery options for an accessible biomethane certificate trading platform in the UK. The work will assess whether such a platform could reduce market friction increase participation and support growth in biomethane supply and demand.